Direct Cost
A cost tied to producing or delivering a specific good or service.
The test is one question: can this cost be traced to a specific unit of what you sell.
Often confused with
- Variable Cost
- Direct is about traceability to a unit; variable is about whether the cost moves with output. A cost can be direct and fixed.
Taught in
See also
3.4.B.1